Power, Water and Construction Summary
Power
It is understood that sufficient power is on hand for the projects requirements.
Below is an approximate breakdown of the various power requirements given at
maximum demand values.
Backup power will be required to maintain growout culture and hatchery requirements for up to 10 hours in case of power outages. The design incorporates sufficient bio safety so that only power to aeration will be necessary during power outages.
No costing has been made on providing the site power distribution installation; however power installation has been included in the establishment of the Growout, Hatchery and Nursery costings and associated buildings to regulation Australian Standards AS 3000.
The site will need to provide considerable power for the various farming areas.